|
|
| |
| Items |
Standard
fee at present (RMB) |
±¸Remark |
|
| |
|
|
| City
infrastructure fee |
Exempted |
|
| Water
for industrial use |
1.508£¯m3 |
Include
standard waste water dealing fee |
| Waste
water draining |
0.22£¯m3 |
Included
in the price of piped water |
| Power
for industrial use |
0.6939£¯kwh |
Studying
for the same price with Qingdao |
| Steam |
80,
85, 90£¯ton |
According
to used quantity |
| Construction
cost |
450-550£¯m2 |
General
factory (Reference) |
| General
worker wage |
500-800£¯month |
(Reference)
|
|
|
|
| |
|