¡¡¡¡Qingdao Coastal University Park lies in the
south of Jiaonan city area. The total planning
area is 28.3km2 and 23.5km2 could be
constructed. It has a coastline of 16km long.
¡¡¡¡It fully use scenery and tour resource, natural
landscape resource, man-made historical interest,
topography and land condition. It overhangs the
artistic conception of "ecological, culture
and modern man-inhabitation" and the configuration
of "mountain and sea".

Program and distribution
¡¡¡The planning of Qingdao Coastal University
Park is divided into three parts: " one belt,
three lines and five zones". "One belt"
refers to the coastal tour belt. "Three lines"
refers to around-mountain tour line, central landscape
line and costal tour line. "Five zones"
refers to higher education and scientific research
zone, university resource enjoy-together zone,
living and resident zone, coastal central service
zone and tour holiday zone.
¡¡¡¡1.Higher education and scientific research
zone: Make up by universities, scientific research
institute and higher middle school. The total
area is 12.09km2 (including to sports
center 0.59km2 ).
¡¡¡¡2.University resource enjoy-together
zone: The total area is 1.88km2 .
¡¡¡¡3.Coastal central service zone: Made
up by finance, business and trade, office business,
medical and health. The total area is 1.65km2
.
¡¡¡¡4.Living and resident zone: The total
area is 2.2km2 .
¡¡¡¡5.Tour and holiday zone: Made up by folklore
village, ecological holiday village distinctive
fishing village and so on. The total area is 5.8km2
.
Systematic planning of road and traffic
¡¡¡¡1.The systematic planning of road and traffic
has formed a main-road frame of "Three vertical
roads and six horizontal roads". "Three
vertical roads" refers to coastal tour road,
central landscape road and around-mountain tour
road. "Six-horizontal roads" refers
to six main horizontal roads, which face the sea.
¡¡¡¡2.There must be no less than 30m weight
afforest belts on two sides of the main roads,
no less than 20m on two sides of the subordinate
roads, in which the branch afforest belt of coastal
tour road is 50m weight.
¡¡¡¡3.There must be no less than 30m weight
afforest belts on two sides of the main roads,
no less than 20m on two sides of the subordinate
roads, in which the branch afforest belt of coastal
tour road is 50m weight.
¡¡¡¡4.Long-distance passenger transport station:
One long-distance passenger transport station
would be set up in the north of the zone where
has a convenient transportation. The area is 100mu.
Systematic planning of afforest landscape
¡¡¡¡Take mountain afforest as background, take the
coast afforest as tie, in order to build a complete
afforest environment system, it emphasizes the
frame of "one part, one belt, six lines and
several points" and the coastal green belt
which has an area of 100mu.
Infrastructure planning
¡¡¡¡1.Water supply: the water is supplied
by Jiaonan city water net, two main water pipes
are brought into the park.
¡¡¡¡2.Water discharge: rainwater and sewage
water are discharged separately, they would be
drained away to the sewage treatment plant by
the high and low distance and hoisting the electric
pump.
¡¡¡¡3.Power supply: According to the planned
land target quota, the load of electricity use
is8,980,000KW. The power source is planned to
remold 35KV.Gaoyu transformer station is 2X50MV
and supply with two ways.
¡¡¡¡4.Telecommunication planning: plan to
constructed three exits and the exchange capacity
of the planned transformer is 17000men.
¡¡¡¡5.Heat supply: The teat source is from
Jiaonan city heat supply net.
|